A snapshot of some significant events in Geocycle’s history:
-
1993 First load of LKF (Liquid Kiln Fuel) dispatched from Geocycle
-
2001 First load of SBF (Solvent Based Fuel) dispatched from Geocycle to Cement Australia’s Gladstone(Queensland) cement kiln
-
2008 First load of HVF (High Viscosity fuel) dispatched from Geocycle to Cement Australia’s Railton (Tasmania) cement kiln.
-
2009 installed and commissioned the Superblender system
-
2013 installed and commissioned the Bulk Solids system
-
2016 successfully commenced the safe and sustainable destruction of a range of contaminated soils and solid materials at Cement Australia’s Railton cement kiln
-
2018 successfully commenced the safe and sustainable destruction of AFFF (PFAS) materials at Cement Australia’s Gladstone cement kiln