PROSTRENGTH® Extra Strength Concrete Mix

PRO50

PROSTRENGTH® Extra Strength Concrete Mix

PROSTRENGTH® Extra Strength Concrete Mix (aka PRO-50) is designed to deliver 50PMa * - twice the strength of a standard concrete mix, so you can build with confidence for more demanding projects. 

* Note: This PROSTRENGTH® Extra Strength Concrete Mix compressive strength & Early Strength Development data was achieved under controlled laboratory conditions, at 23 degrees Centigrade. They should be used only as a guide to potential strength as various factors can impact final strength results. 


TMR Approved product - Bagged Concrete (for frangible support posts). Registered product: MRTS14
Product index for bridges and other structures

 

Safety Data Sheet
Available Sizes
1.1 Tonne
20kg
Applications
Clothesline

Clothes Lines

Concrete Repairs

Concrete Repairs

Landscaping

Landscaping

Uprights

Uprights

Post Set Concrete

Posts

  • Twice the strength of standard Concrete Mix  
  • Faster Strength Gain – perfect for drilling earlier or walking on it the next day 
  • Greater durability and resistance to wear 
  • Reduced concrete permeability and a smoother surface finish 

If using a concrete mixer, add 2 litres of clean water per bag of PROSTRENGTH® Extra Strength Concrete Mix (aka PRO-50) to the mixing vessel. Empty the PROSTRENGTH® Extra Strength Concrete Mix blend slowly into the water and mix thoroughly. If needing more workability, up to 0.5 litres of water may be added. Too much water ruins good concrete.

Or

if using a wheelbarrow, place Concrete Mix in the barrow, create a hollow and add 2 litres of water per bag and mix.  If needing more workability, up to 0.5 litres of water may be added. Too much water ruins good concrete.

Place the well mixed concrete in the formwork filling all corners, and compact. Level the concrete with a straight edge and finish the top surface with a wooden float or steel trowel. Keep the surface moist for 7 days to achieve maximum strength. Formwork may be removed after 24 hours. Don't walk on the concrete for at least 24 hours after placing.